Data center in Herndon
Data center in Herndon is a data center under construction in Herndon, United States. Our footprint estimate of its power is about 14 MW.
Key facts
| Status | Under construction |
|---|---|
| Facility power | 14 MW (range 7 MW to 22 MW) Estimate from building footprint, low confidence. Footprint estimate: about 11,611 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 6,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Redskin Drive, 20171, Herndon |
| Coordinates | 38.93540, -77.42670 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Herndon use?
We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.
Data centers near Herndon
- 365 Data Centers Herndon (VA1) 202 m
- Amazon IAD-500 211 m · 28 MW
- Menlo Digital MD-VA1 942 m · 62 MW
- Amazon IAD-167 1.4 km · 12 MW
- Amazon IAD-135 4.2 km · 21 MW
- Amazon IAD-9 4.6 km · 14 MW
- H5 Data Centers Virginia (4030) 4.9 km · 20 MW
- Amazon IAD-150 4.9 km · 63 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.