Data Center Directory

Meta Temple Data Center

Meta Temple Data Center is an operational data center operated by Meta in Temple, United States. Our footprint estimate of its power is about 178 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Key facts

StatusOperational
OperatorMeta
Facility power178 MW (range 71 MW to 446 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,485,193 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 76,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates31.12982, -97.36718

Satellite view

Questions

How much power does Meta Temple Data Center use?

We estimate the facility power at about 178 MW. Estimate from building footprint, low confidence.

What chips does Meta Temple Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

Who operates Meta Temple Data Center?

Meta.

Data centers near Temple

More Meta data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.