Bank of America Data Center
Bank of America Data Center is an operational data center operated by Bank of America in Sandston, United States. Our footprint estimate of its power is about 38 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Bank of America |
| Facility power | 38 MW (range 15 MW to 94 MW) Estimate from building footprint, low confidence. Footprint estimate: about 314,558 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 16,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 37.49605, -77.23818 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Bank of America Data Center use?
We estimate the facility power at about 38 MW. Estimate from building footprint, low confidence.
Who operates Bank of America Data Center?
Bank of America.
Data centers near Sandston
- Iron Mountain data center in Sandston 374 m · 41 MW
- RIC2 DC2 1.0 km · 50 MW
- QTS Richmond (RIC1) 1.0 km
- RIC1 DC3 1.1 km
- QTS Richmond 1 1.1 km · 333 MW
- QTS Richmond 2 Data Center 1.3 km · 86 MW
- Meta Research SuperCluster (RSC-1) 1.3 km · 13 MW
- DC5 1.6 km · 57 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.