Oppidan data center in Hilliard
Oppidan data center in Hilliard is an operational data center operated by Oppidan in Hilliard, United States. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Oppidan |
| Facility power | 11 MW (range 5.5 MW to 18 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,167 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.05267, -83.12742 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Oppidan data center in Hilliard use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
Who operates Oppidan data center in Hilliard?
Oppidan.
Data centers near Hilliard
- Amazon AWS: Hilliard Data Center 990 m · 32 MW
- Amazon Web Services 3.5 km · 28 MW
- Data center in Hilliard 3.6 km · 36 MW
- Amazon Web Services 4.0 km · 25 MW
- Amazon Web Services 4.1 km · 28 MW
- Expedient Columbus - Upper Arlington 4.2 km
- DartPoints Dublin, OH - CMH1 4.5 km
- Expedient Columbus - Dublin 4.6 km