Prime Data Centers
Prime Data Centers is a data center under construction in Elk Grove Village, United States. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Under construction |
|---|---|
| Facility power | 11 MW (range 5.4 MW to 17 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,954 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 42.02308, -87.96180 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Prime Data Centers use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
Data centers near Elk Grove Village
- Microsoft CHI12 Data Center 816 m · 13 MW
- T5@Chicago 990 m · 14 MW
- EdgeConnex Data Center 1.2 km · 7.1 MW
- Stream Data Centers 1.5 km · 17 MW
- Forsythe Data Centers 1.8 km · 28 MW
- Aligned Data Center 2.2 km · 40 MW
- GigeNET CHI3 2.3 km
- Stream Data Centers - Chicago I 2.4 km · 15 MW
Sources
Correct this page or get the data