Data Center Directory

US Bitcoin data center in Niagara Falls

US Bitcoin data center in Niagara Falls is an operational data center operated by US Bitcoin in Niagara Falls, United States. Our footprint estimate of its power is about 13 MW.

Key facts

StatusOperational
OperatorUS Bitcoin
Facility power13 MW (range 6.7 MW to 21 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 11,143 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Opened2020
Coordinates43.08218, -79.03078

Satellite view

Questions

How much power does US Bitcoin data center in Niagara Falls use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

Who operates US Bitcoin data center in Niagara Falls?

US Bitcoin.

Data centers near Niagara Falls

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.