Data center in Lackland Air Force Base
Data center in Lackland Air Force Base is an operational data center in Lackland Air Force Base, United States. Our footprint estimate of its power is about 21 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 21 MW (range 10 MW to 33 MW) Estimate from building footprint, low confidence. Footprint estimate: about 17,368 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 9,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 29.41580, -98.78642 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Lackland Air Force Base use?
We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.
Data centers near Lackland Air Force Base
- CyrusOne SAT10 & SAT11 302 m · 12 MW
- Vantage TX1 383 m · 45 MW
- Microsoft 1.6 km · 31 MW
- Microsoft TRP1 1.6 km · 15 MW
- Microsoft Texas Research Park Campus 1.7 km · 87 MW
- Microsoft TRP3 (SAT46) 2.0 km · 19 MW
- Data center in Leon Valley 7.9 km · 14 MW
- Data center in Leon Valley 8.1 km · 14 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.