Data center in Cheyenne
Data center in Cheyenne is an operational data center in Cheyenne, United States. Our footprint estimate of its power is about 5.8 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 5.8 MW (range 2.9 MW to 9.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,823 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.12404, -104.89927 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Cheyenne use?
We estimate the facility power at about 5.8 MW. Estimate from building footprint, low confidence.
Data centers near Cheyenne
- Microsoft data center in Cheyenne 171 m · 5.3 MW
- Data center in Cheyenne 268 m · 3.2 MW
- Data center in Cheyenne 331 m · 14 MW
- MineOne Wyoming Data Center 385 m · 4.6 MW
- Microsoft CYS Datacenter 391 m · 131 MW
- University Corporation for Atmospheric Research data center in Cheyenne 542 m · 6.4 MW
- Data center in Cheyenne 769 m · 19 MW
- ACT Cheyenne 789 m
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.