Data Center Directory

Cisco Allen

Cisco Allen is an operational data center in Allen, United States. Our footprint estimate of its power is about 15 MW.

Key facts

StatusOperational
Facility power15 MW (range 7.5 MW to 24 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 12,455 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressChelsea Boulevard 2260
Coordinates33.13596, -96.66099

Satellite view

Questions

How much power does Cisco Allen use?

We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.

Data centers near Allen

Sources

Correct this page or get the data