Microsoft Fairwater AI Phase 2 is a data center under construction in Sturtevant, United States. Our footprint estimate of its power is about 105 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Power demand is growing at this site

Key facts

StatusUnder construction
Facility power105 MW (range 42 MW to 263 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 875,307 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 45,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates42.67651, -87.91034

Satellite view

Questions

How much power does Microsoft Fairwater AI Phase 2 use?

We estimate the facility power at about 105 MW. Estimate from building footprint, low confidence.

What chips does Microsoft Fairwater AI Phase 2 use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).