Microsoft Fairwater AI Phase 2
Microsoft Fairwater AI Phase 2 is a data center under construction in Sturtevant, United States. Our footprint estimate of its power is about 105 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Facility power | 105 MW (range 42 MW to 263 MW) Estimate from building footprint, low confidence. Footprint estimate: about 875,307 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 45,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 42.67651, -87.91034 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Fairwater AI Phase 2 use?
We estimate the facility power at about 105 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Fairwater AI Phase 2 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
Data centers near Sturtevant
- Data center in Sturtevant 666 m · 1 MW
- Microsoft Fairwater AI Datacenter 838 m · 123 MW
- Data center in Sturtevant 1.2 km · 27 MW
- Microsoft Fairwater Wisconsin 1.3 km · 442 MW
- Microsoft Fairwater Phase 2 2.5 km · 316 MW
- CyberLynk MKE1 21.4 km
- Expedient Milwaukee 21.5 km · 2.7 MW
- TierPoint Milwaukee 37.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.