CoreWeave Chester VA

CoreWeave Chester VA is an operational data center that is still expanding, operated by CoreWeave in VA, United States. Its power is about 114 MW, growing to about 197 MW by 2027-06. Epoch AI estimates about 88,000 H100-equivalent AI chips (H100, B200).

Power demand is growing at this site

Key facts

StatusOperational, expanding
OperatorCoreWeave
UsersOpenAI (speculative)
Facility power114 MW
Reported (Epoch AI or owner data)
IT power82 MW
Planned power197 MW by 2027-06-30
Epoch AI timeline projection.
AI compute88,000 H100-equivalents → 126,000 planned
AI chipsH100, B200
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 46,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 3.1 billion → 4.3 billion planned
Epoch AI estimate, 2025 USD.
Address1401 Meadowville Technology Parkway, Chester, VA
Coordinates37.34895, -77.43838 (city level)

Build timeline

DatePowerH100eWhat the satellite images and filings show
2023-09-1800Conversion starts at CTP-01 (Building 1). The data center was formerly owned by Capital One, now leased to CoreWeave. Source: https://www.datacenterdynamics.com/en/news/chirisa-secures-200-million-loan-to-fit-out-virginia-data-center-for-coreweave/
2024-01-3125 MW15,000Building 1's second data hall scheduled to come online this month.
2024-04-3038 MW22,000Building 1 is scheduled to be fully online by this point, so we count the full 27 MW as operational here.
2025-01-2238 MW22,000Satellite imagery shows Building 1 complete, with Building 2's yard work and early construction visible. Building 3 hasn't started yet, since the old building is still there.
2026-05-20114 MW88,000Based on satellite imagery, Building 3 has cleared its land and is beginning construction. Building 2 is operational judging from the colored motion artifacts on the cooling tower fans.
2027-06-30 (projected)197 MW126,000Buildings 3 is estimated complete by the end of Q1 2027, based on the current PowerHouse schedule. Added another three months to account for commissioning and server installation.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2024-01-31H10014,800Estimate
2024-04-30H10022,100Estimate
2026-05-20B20026,162Estimate
2027-06-30B20041,012Estimate

Satellite view

Questions

How much power does CoreWeave Chester VA use?

Public data puts the facility power at about 114 MW, with about 197 MW planned by 2027. Reported (Epoch AI or owner data).

What chips does CoreWeave Chester VA use?

Reported chips: H100, B200.

Who operates CoreWeave Chester VA?

CoreWeave. Reported users: OpenAI.