Google Lancaster

Google Lancaster is an operational AI data center operated by Google in Lancaster, United States. Its power is about 164 MW. Epoch AI estimates about 130,000 H100-equivalent AI chips (TPU v5e, TPU v6e).

Key facts

StatusOperational
OperatorGoogle
Facility power164 MW
Reported (Epoch AI or owner data)
IT power137 MW
AI compute130,000 H100-equivalents
AI chipsTPU v5e, TPU v6e
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 76,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 5.2 billion
Epoch AI estimate, 2025 USD.
Address105 Whiley Rd, Lancaster, OH 43130
Coordinates39.72704, -82.68314

Build timeline

DatePowerH100eWhat the satellite images and filings show
2021-10-0100Land clearing in progress for the site
2024-01-0182 MW35,000Building 1 operational. This is estimated based on construction progress in [October 2023](https://earth.google.com/web/@39.72490515,-82.68845499,280.4138206a,1128.806013d,35y,-0h,0t,0r/data=CnUaXRJXCiUweDg4NDc4OWI3MDRhZGE1MWQ6MHg0Y2Q1MjE2ZGM0YTQ0YTc5GSZeVEH73ENAISDkBo2qq1TAKhwxMDQgV2hpbGV5IFJkLCBMYW5jYXN0ZXIsIE9IGAIgASoQCAESCjIwMjMtMDUtMTAYAUICCAFCAggASg0I____________ARAA). This also corresponds to a [2023 article](https://ohiocapitaljournal.com/2023/08/29/google-announces-plans-to-invest-1-7-billion-in-a-trio-of-central-ohio-data-centers/) where a Google spokesperson says that the "the Lancaster data center will open later this year".
2025-09-1182 MW35,000Building 2 is close to completion. Structurally it is already complete, but there is still some equipment strewn around the building that suggests commissioning is ongoing.
2025-10-31164 MW130,000Building 2 operational. This is supported by the state of Building 2 a month prior, which is entirely complete outside of some equipment that was removed later on.
2026-03-12164 MW130,000At this point, Building 1 and 2 have since already been operational. Additionally, there is visible steam showing clear evidence of operational for both before this date.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2024-01-01TPU v5e174,561Estimate
2025-10-31TPU v6e103,359Estimate

Satellite view

Questions

How much power does Google Lancaster use?

Public data puts the facility power at about 164 MW. Reported (Epoch AI or owner data).

What chips does Google Lancaster use?

Reported chips: TPU v5e, TPU v6e.

Who operates Google Lancaster?

Google.