CyrusOne NVA9 is an operational data center operated by CyrusOne in South Riding, United States. Our footprint estimate of its power is about 15 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power15 MW (range 7.5 MW to 24 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 12,569 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressOld Ox Road 43304
Coordinates38.95885, -77.50261

Satellite view

Questions

How much power does CyrusOne NVA9 use?

We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.

Who operates CyrusOne NVA9?

CyrusOne.