LCO 1 is an operational data center operated by Meta in New Albany, United States. Our footprint estimate of its power is about 44 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Facility power | 44 MW (range 22 MW to 71 MW) Estimate from building footprint, low confidence. Footprint estimate: about 37,018 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 19,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.06149, -82.74055 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does LCO 1 use?
We estimate the facility power at about 44 MW. Estimate from building footprint, low confidence.
What chips does LCO 1 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
Who operates LCO 1?
Meta.
Data centers near New Albany
- Meta LCO 3 Project 401 m · 174 MW
- Meta New Albany Data Center 844 m · 119 MW
- NAO 5/NAO 6 897 m · 88 MW
- NAO 1/NAO 2 1.1 km · 120 MW
- Google New Albany 1.5 km · 400 MW
- Quality Technology Services data center in New Albany 1.5 km · 27 MW
- Quality Technology Data Center 1.6 km · 15 MW
- Data center in New Albany 1.9 km · 18 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.