Tennessee Processing Center LLC is an operational data center operated by BNYM in Nashville, United States. Our footprint estimate of its power is about 8.6 MW.

Key facts

StatusOperational
OperatorBNYM
Facility power8.6 MW (range 3.4 MW to 21 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 71,390 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 3,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates36.21564, -86.78400

Satellite view

Questions

How much power does Tennessee Processing Center LLC use?

We estimate the facility power at about 8.6 MW. Estimate from building footprint, low confidence.

Who operates Tennessee Processing Center LLC?

BNYM.

Data centers near Nashville

Sources

Correct this page or get the data