Compute North is an operational data center in Kearney, United States. Our footprint estimate of its power is about 3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3 MW (range 1.2 MW to 7.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 25,175 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 1,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.72593, -99.03834 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Compute North use?
We estimate the facility power at about 3 MW. Estimate from building footprint, low confidence.
Sources
Correct this page or get the data