Data Center Directory

Stack Infrastructure PHX01 Campus

Stack Infrastructure PHX01 Campus is a data center under construction in Goodyear, United States. Our footprint estimate of its power is about 26 MW.

Key facts

StatusUnder construction
Facility power26 MW (range 10 MW to 65 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 217,382 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 11,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates33.41722, -112.35552

Satellite view

Questions

How much power does Stack Infrastructure PHX01 Campus use?

We estimate the facility power at about 26 MW. Estimate from building footprint, low confidence.

Data centers near Goodyear

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.