Hurricane Electric Fremont 1 is an operational data center operated by Hurricane Electric in Fremont, United States. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Hurricane Electric |
| Facility power | 11 MW (range 5.3 MW to 17 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,385 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 40 networks, 3 internet exchanges PeeringDB. |
| Address | 760 Mission Ct |
| Coordinates | 37.48988, -121.93101 |
| Website | he.net/colocation.html |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Hurricane Electric Fremont 1 use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
Who operates Hurricane Electric Fremont 1?
Hurricane Electric.
Data centers near Fremont
- XO Fremont 1.8 km · 10 MW
- Hurricane Electric Fremont 2 2.2 km · 54 MW
- T5@SiliconValley 6.6 km
- Dell 350 Holger Way 8.0 km · 4.6 MW
- Petadata 8.3 km
- Coresite - Milpitas (SV2) 9.5 km · 14 MW
- ServerFarm SC1 9.7 km · 5.1 MW
- NTT Global Data Centers data center in San Jose 10.2 km · 11 MW
More Hurricane Electric data centers
- Hurricane Electric Fremont 2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.