Methodology
Sources
- Epoch AI, Frontier Data Centers and GPU Clusters (CC-BY 4.0). Power, chips, H100-equivalents, timelines and costs for the largest AI sites. Epoch AI reads satellite images, permits and filings.
- OpenStreetMap (ODbL). Locations and building outlines tagged
telecom=data_center,building=data_centerorindustrial=data_centre. - GeoNames (CC-BY 4.0). Nearest city and country for each point.
Merge rules
We match records closer than 150 to 250 m when the operator agrees, or closer than 60 m in any case. Epoch AI wins over OpenStreetMap. Some campuses can still show as two sites, and some neighbour sites can merge. Send us a correction when you see one.
Labels on every number
| A | Reported (Epoch AI or owner data) |
|---|---|
| B | Derived from a tagged IT power value |
| C | Estimate from building footprint, low confidence |
| G | Guess from the operator, not confirmed |
Formulas
- Footprint power (C): building outline area × floors × 1.2 kW per m² (range 0.5× to 1.6×). A site outline without a building tag: land area × 0.12 kW per m² (range 0.4× to 2.5×). We calibrated both values on Epoch AI sites with a known power and an OpenStreetMap outline.
- GPU capacity if all AI: IT power ÷ 1.8 kW per GPU (GB200 NVL72 class, all-in). IT power = facility power ÷ PUE 1.3. This is an upper bound, not a count.
- Chip guesses (G): a rule table by operator. Example: Google sites → TPU, AWS sites → Trainium and NVIDIA.
Status
For Epoch AI sites, status comes from the dated timeline: power today is zero → under construction, planned power above today → expanding. For other sites, status comes from OpenStreetMap construction tags. Otherwise we show operational.