CyrusOne data center in Chandler

CyrusOne data center in Chandler is an operational data center operated by CyrusOne in Chandler, United States. Our footprint estimate of its power is about 14 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power14 MW (range 7.1 MW to 23 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 11,753 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 6,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressSouth Ellis Street 2335, 85286, Chandler
Coordinates33.26635, -111.88330
Websitecyrusone.com/data-centers/north-america/chandler-arizona

Satellite view

Questions

How much power does CyrusOne data center in Chandler use?

We estimate the facility power at about 14 MW. Estimate from building footprint, low confidence.

Who operates CyrusOne data center in Chandler?

CyrusOne.

Data centers near Chandler

More CyrusOne data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.