Microsoft Goodyear Campus

Microsoft Goodyear Campus is an operational data center in Litchfield Park, United States. Our footprint estimate of its power is about 81 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
Facility power81 MW (range 32 MW to 202 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 674,827 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 35,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates33.48990, -112.43799

Satellite view

Questions

How much power does Microsoft Goodyear Campus use?

We estimate the facility power at about 81 MW. Estimate from building footprint, low confidence.

What chips does Microsoft Goodyear Campus use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).