Meta Hyperion
Meta Hyperion is a data center under construction operated by Meta in Holly Ridge, United States. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | Meta |
| Users | Meta |
| Project | Hyperion |
| Planned power | 2.2 GW by 2028-01-01 Epoch AI timeline projection. |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| Builders | Mortenson |
| Energy partners | Entergy |
| Address | Holly Ridge, LA 71269 |
| Coordinates | 32.46764, -91.62679 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-12-20 | 0 | 0 | Land clearing begins. |
| 2025-10-19 | 0 | 0 | Foundations are underway for the main buildings, and the overall layout aligns with the [architectural renderings](https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/) published in 2025. |
| 2026-04-19 | 0 | 0 | Building 1 and 2 roof is finished and cooling is at an advanced stage of installation. Building 3 and 6 roof and cooling in progress. |
| 2026-12-01 (projected) | 0 | 0 | New [power stations](https://drive.google.com/file/d/1D4eUHwEuirNi0g3IU_xGOti3PcC8fcXi/view?usp=sharing) are in service for a 1.8 GW load at Holly Ridge. However, the data center is still not operational. |
| 2028-01-01 (projected) | 2.2 GW | 4.1 million | First phase is operational, based on a [Meta blog post](https://drive.google.com/file/d/1PmFNgOwkPepwjpGIbNUuPJP0LNgIqe7l/view?usp=sharing). We assume that this aligns with the three natural gas turbines being completed, for a total of 2262 MW capacity, but that these turbines have a backup role. This is close to the 1800 MW of load requested from the grid. Meta [claims](https://engineering.fb.com/2025/09/29/data-infrastructure/metas-infrastructure-evolution-and-the-advent-of-ai/) that "The Hyperion cluster will have a 5-gigawatt capacity once complete", but so far there is no concrete evidence for this happening at the Holly Ridge site alone. |
Source: Epoch AI Frontier Data Centers.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Meta Hyperion use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
Who operates Meta Hyperion?
Meta. Reported users: Meta.
Data centers near Holly Ridge
More Meta data centers
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
- Meta Kuna Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.