Microsoft SAT 81 is an operational data center operated by Microsoft in San Antonio, United States. Our footprint estimate of its power is about 21 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power21 MW (range 10 MW to 34 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 17,498 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 9,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMicrosoft SAT 82 · Microsoft SAT 80
AddressFM1957 18844, 78009, San Antonio
Coordinates29.42800, -98.87665

Satellite view

Questions

How much power does Microsoft SAT 81 use?

We estimate the facility power at about 21 MW. Estimate from building footprint, low confidence.

What chips does Microsoft SAT 81 use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

Who operates Microsoft SAT 81?

Microsoft.