T-Mobile Everglades MSO Data Center
T-Mobile Everglades MSO Data Center is an operational data center in Sunrise, United States. Our footprint estimate of its power is about 4.9 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.9 MW (range 2.4 MW to 7.8 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,076 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Northwest 103rd Avenue 4850, 33351, Sunrise |
| Coordinates | 26.18499, -80.28688 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does T-Mobile Everglades MSO Data Center use?
We estimate the facility power at about 4.9 MW. Estimate from building footprint, low confidence.
Data centers near Sunrise
- Flexential - Fort Lauderdale (FLL1/2) 9.4 km · 6.5 MW
- 365 Data Centers Ft. Lauderdale (FLL) 9.6 km
- 500 Green (AKA VOLICO 2.0) 19.5 km
- Globenet Boca Raton CLS 26.6 km
- EdgeConneX Miami (EDCMIA02) 28.3 km
- Equinix MI3 - Miami, Boca Raton 28.8 km
- Cogent Boca Raton 29.1 km
- Telxius Boca Raton DC 30.0 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.