Microsoft East Point Datacenter Campus

Microsoft East Point Datacenter Campus is an operational data center operated by Microsoft in Union City, United States. Our footprint estimate of its power is about 36 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power36 MW (range 14 MW to 90 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 301,621 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 15,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMicrosoft
Coordinates33.64104, -84.51751
Websitelocal.microsoft.com/blog/east-point-datacenter-project-overview

Satellite view

Questions

How much power does Microsoft East Point Datacenter Campus use?

We estimate the facility power at about 36 MW. Estimate from building footprint, low confidence.

What chips does Microsoft East Point Datacenter Campus use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

Who operates Microsoft East Point Datacenter Campus?

Microsoft.

Data centers near Union City

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.