Meta Cheyenne
Meta Cheyenne is an operational data center that is still expanding, operated by Meta in Cheyenne, United States. Its power is about 182 MW, growing to about 249 MW by 2027-02. Epoch AI estimates about 173,000 H100-equivalent AI chips (B300).
Power demand is growing at this site
Key facts
| Status | Operational, expanding |
|---|---|
| Operator | Meta |
| Users | Meta |
| Facility power | 182 MW Reported (Epoch AI or owner data) |
| IT power | 152 MW |
| Planned power | 249 MW by 2027-02-15 Epoch AI timeline projection. |
| AI compute | 173,000 H100-equivalents → 236,000 planned |
| AI chips | B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 84,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 5.8 billion → 7.8 billion planned Epoch AI estimate, 2025 USD. |
| Address | Cheyenne, WY 82007, USA |
| Coordinates | 41.13998, -104.82025 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-05-01 | 0 | 0 | Land clearing begins. |
| 2025-01-30 | 0 | 0 | Structure for Building 1 and 2 under construction. |
| 2026-03-22 | 0 | 0 | Building 1 shell and cooling looks complete, Building 2 roof almost complete. |
| 2026-07-25 | 182 MW | 173,000 | Both buildings estimated to be operational. |
| 2027-02-15 (projected) | 249 MW | 236,000 | Buildings 3 and 4 are similar in style and size to the ones seen at the Prometheus site, we estimate their operability based on that timeline. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-07-25 | B300 | 68,367 | Estimate |
| 2027-02-15 | B300 | 93,430 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta Cheyenne use?
Public data puts the facility power at about 182 MW, with about 249 MW planned by 2027. Reported (Epoch AI or owner data).
What chips does Meta Cheyenne use?
Reported chips: B300.
Who operates Meta Cheyenne?
Meta. Reported users: Meta.
Data centers near Cheyenne
- MineOne Wyoming Data Center 6.5 km · 4.6 MW
- University Corporation for Atmospheric Research data center in Cheyenne 6.5 km · 6.4 MW
- Meta Cheyenne Data Center 6.7 km · 215 MW
- Microsoft data center in Cheyenne 6.7 km · 5.3 MW
- Data center in Cheyenne 6.8 km · 3.2 MW
- Data center in Cheyenne 6.9 km · 5.8 MW
- Data center in Cheyenne 7.0 km · 30 MW
- Data center in Cheyenne 7.0 km · 14 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.