Meta Aiken Data Center is a data center under construction operated by Meta in Aiken, United States. Our footprint estimate of its power is about 133 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | Meta |
| Facility power | 133 MW (range 53 MW to 331 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,104,345 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 57,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.64230, -81.84426 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta Aiken Data Center use?
We estimate the facility power at about 133 MW. Estimate from building footprint, low confidence.
What chips does Meta Aiken Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
Who operates Meta Aiken Data Center?
Meta.
Data centers near Aiken
- Meta Aiken 11.0 km · 168 MW
- Columbia County Community Broadband Utility 29.1 km
- T5@Augusta 36.8 km
- DartPoints Columbia, SC - CAE1 84.4 km
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.