Data Center Directory

NAO 5/NAO 6

NAO 5/NAO 6 is an operational data center operated by Meta in New Albany, United States. Our footprint estimate of its power is about 88 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Key facts

StatusOperational
OperatorMeta
Facility power88 MW (range 44 MW to 140 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 73,091 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 38,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates40.06038, -82.75099

Satellite view

Questions

How much power does NAO 5/NAO 6 use?

We estimate the facility power at about 88 MW. Estimate from building footprint, low confidence.

What chips does NAO 5/NAO 6 use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

Who operates NAO 5/NAO 6?

Meta.

Data centers near New Albany

More Meta data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.