Hyperscale Data Center
Hyperscale Data Center is an operational data center in Dowagiac, United States. Our footprint estimate of its power is about 15 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 15 MW (range 5.9 MW to 37 MW) Estimate from building footprint, low confidence. Footprint estimate: about 122,867 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.99322, -86.09817 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Hyperscale Data Center use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
Data centers near Dowagiac
- Midwest Energy & Communications 13.2 km
- Microsoft Granger Data Center 29.4 km · 138 MW
- Microsoft Granger Data Center 30.6 km · 257 MW
- GAP Union Station 38.3 km
- Aunalytics South Bend Datacenter (AUSB) 39.2 km
- Aunalytics Kalamazoo Datacenter 44.8 km
- Data center in South Bend 45.1 km · 19 MW
- Data center in South Bend 45.3 km · 19 MW