Modesto Junior College West Data Center
Modesto Junior College West Data Center is an operational data center operated by Yosemite Community College District in Modesto, United States. Our footprint estimate of its power is about 0.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Yosemite Community College District |
| Facility power | 0.6 MW (range 0.3 MW to 1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 515 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 260 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 37.66514, -121.04003 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Modesto Junior College West Data Center use?
We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.
Who operates Modesto Junior College West Data Center?
Yosemite Community College District.
Data centers near Modesto
- Volt Modesto 4.2 km
- 801 Tenth Street Modesto (Ayera) 4.7 km
- EZ Network Systems 42.3 km
- Lawrence Livermore NL RZAdams 59.0 km · 2.1 MW
- Lawrence Livermore NL El Capitan 64.1 km · 35 MW
- QES Computers 76.1 km
- NTT Global Data Centers data center in San Jose 80.3 km · 11 MW
- Hurricane Electric Fremont 2 80.5 km · 54 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.