Data Center Directory

Modesto Junior College West Data Center

Modesto Junior College West Data Center is an operational data center operated by Yosemite Community College District in Modesto, United States. Our footprint estimate of its power is about 0.6 MW.

Key facts

StatusOperational
OperatorYosemite Community College District
Facility power0.6 MW (range 0.3 MW to 1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 515 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 260 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates37.66514, -121.04003

Satellite view

Questions

How much power does Modesto Junior College West Data Center use?

We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.

Who operates Modesto Junior College West Data Center?

Yosemite Community College District.

Data centers near Modesto

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.