Meta Bowling Green is a data center under construction operated by Meta in Bowling Green, United States. No power figure is public for this site yet. Likely chips: B300.
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | Meta |
| Users | Meta |
| Planned power | 570 MW by 2028-01-01 Epoch AI timeline projection. |
| AI chips | B300 Reported (Epoch AI or owner data) |
| Energy partners | Williams |
| Address | 12356 Middleton Pike, Bowling Green, OH 43402 |
| Coordinates | 41.37477, -83.65132 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-11-01 | 0 | 0 | Land clearing begins. |
| 2026-02-14 | 0 | 0 | Buildings 1 and 2 under construction. Building 1's chillers are almost all in place, while only half of Building 2's are. Optimus substation, which is the substation on site, and the expansion of Dowling Substation, an existing substation to the northeast of the data center, appear complete. |
| 2026-07-30 | 0 | 0 | Roofs of Buildings 1 and 2 are more than halfway complete. All chillers for both buildings are visible. Construction on Buildings 3 and 4 has begun, with outlines laid. Construction on the [Apollo Power Generation Project](https://archive.ph/lqgZw) (a BTM power plant built just to the east of the data center) is in progress, with foundations poured and generation equipment being set in place. |
| 2027-02-01 (projected) | 117 MW | 104,000 | Building 1 is operational, based on a 5 month extrapolation from its roof completion date. |
| 2027-04-01 (projected) | 220 MW | 197,000 | Building 2 is operational, based on construction progress as of Sep 2026 and foundations being laid around 2 months after Building 1. |
| 2028-01-01 (projected) | 570 MW | 855,000 | Buildings 3 and 4 are operational, based on their construction starting 11 months after Building 1. We assume they are powered by the 350 MW Apollo Power Generation Project. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2027-02-01 | B300 | 41,349 | Estimate |
| 2027-04-01 | B300 | 77,973 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Meta Bowling Green use?
Reported chips: B300.
Who operates Meta Bowling Green?
Meta. Reported users: Meta.
Data centers near Bowling Green
- Meta Bowling Green Data Center 10.1 km · 236 MW
- Data center in Lambertville 48.1 km
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
- Meta Kuna Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.