Data Center Directory

HEB data center in San Antonio

HEB data center in San Antonio is an operational data center operated by HEB in San Antonio, United States. Our footprint estimate of its power is about 6.8 MW.

Key facts

StatusOperational
OperatorHEB
Facility power6.8 MW (range 3.4 MW to 11 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,682 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,900 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressHuebner Road 15103, San Antonio
Coordinates29.58015, -98.54130

Satellite view

Questions

How much power does HEB data center in San Antonio use?

We estimate the facility power at about 6.8 MW. Estimate from building footprint, low confidence.

Who operates HEB data center in San Antonio?

HEB.

Data centers near San Antonio

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.