Data Center Directory

CyrusOne CHI9

CyrusOne CHI9 is an operational data center operated by CyrusOne in Aurora, United States. Our footprint estimate of its power is about 32 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power32 MW (range 16 MW to 52 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 26,895 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 14,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressBilter Road 2725, 60502, Aurora
Coordinates41.80286, -88.24675
Websitecyrusone.com/data-centers/north-america/aurora-il-chi9

Satellite view

Questions

How much power does CyrusOne CHI9 use?

We estimate the facility power at about 32 MW. Estimate from building footprint, low confidence.

Who operates CyrusOne CHI9?

CyrusOne.

Data centers near Aurora

More CyrusOne data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.