Data Center Directory

CoreWeave Denton TX

CoreWeave Denton TX is an operational data center that is still expanding, operated by CoreWeave in Denton, United States. Its power is about 367 MW, growing to about 395 MW by 2027-05. Epoch AI estimates about 253,000 H100-equivalent AI chips (B200).

Power demand is growing at this site

Key facts

StatusOperational, expanding
OperatorCoreWeave
UsersOpenAI (likely)
Facility power367 MW
Reported (Epoch AI or owner data)
IT power262 MW
Planned power395 MW by 2027-05-31
Epoch AI timeline projection.
AI compute253,000 H100-equivalents → 272,000 planned
AI chipsB200
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 150,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 9.9 billion → 10.7 billion planned
Epoch AI estimate, 2025 USD.
Address8171 Jim Christal Rd, Denton, TX 76207
Coordinates33.21927, -97.17472

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-11-0100Construction start - The [Texas Department of Licensing and Regulation](https://www.tdlr.texas.gov/TABS/Search/Print/TABS2025005706) reports Core Scientific is converting existing Bitcoin mining buildings into AI data centers, planning to build AROUND the existing Denton Energy Center.
2025-05-3111 MW7,782First 8 MW billable tranche dedicated to AI [starts running at the site](https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001628280-25-023161/q12025corescientificinc-ea.htm), with another 40 scheduled by the end of the quarter.
2025-12-3194 MW65,000Half the campus energized. 67 billable MW [are now dedicated](https://d1io3yog0oux5.cloudfront.net/_68280da94b2098ec46fcbe3f4628ea40/corescientific/db/1085/11265/presentation/Q4+FY25+earnings+deck+vfinal.2+PDF.pdf) to CoreWeave's GPUs across three buildings.
2026-02-23183 MW126,000Buildings 1-3 (Denton North) are largely built out/operational, and Denton South has its first data hall plus support equipment substantially installed. Remaining Denton South buildings (4-7) still under construction. This is according to satellite imagery.
2026-03-02183 MW126,000Buildings 1-3 (Denton North) are fully operational running AI (Denton North at 90 MW, Denton South partially running at 41). This is according to an [earnings call](https://www.fool.com/earnings/call-transcripts/2026/03/02/core-scientific-corz-q4-2025-earnings-transcript/) from this date.
2026-07-03367 MW253,000Buildings 1-7 are operational and running, with no construction work visible. This is based on both satellite imagery, and the [Q2 2026 Earnings call](https://d1io3yog0oux5.cloudfront.net/_68280da94b2098ec46fcbe3f4628ea40/corescientific/db/1066/11282/pdf/Q2+FY26+earnings+deck+7.28+AM.pdf) stating the campus was operational by midyear 2026.
2026-09-01367 MW253,000Building 8 interior fit-out scheduled to begin. [TDLR project TABS2026028247](https://www.tdlr.texas.gov/TABS/Projects/TABS2026028247) schedules a $110M interior fit-out of the existing 27,678.22 sq ft Building A as a data hall beginning September 1, 2026.
2027-05-31 (projected)395 MW272,000Building 8 projected operational. [TDLR project TABS2026028247](https://www.tdlr.texas.gov/TABS/Projects/TABS2026028247) schedules Building A's data-hall fit-out for completion by this date.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-12-31B20016,000Estimate
2026-02-23B20050,000Reported
2026-07-03B200100,000Estimate
2027-05-31B200107,634Estimate

Satellite view

Questions

How much power does CoreWeave Denton TX use?

Public data puts the facility power at about 367 MW, with about 395 MW planned by 2027. Reported (Epoch AI or owner data).

What chips does CoreWeave Denton TX use?

Reported chips: B200.

Who operates CoreWeave Denton TX?

CoreWeave. Reported users: OpenAI.

Data centers near Denton

More CoreWeave data centers

Sources

Correct this page or get the data