Data Center Directory

CyrusOne Allen Campus

CyrusOne Allen Campus is an operational data center operated by CyrusOne in Allen, United States. Our footprint estimate of its power is about 16 MW.

Key facts

StatusOperational
OperatorCyrusOne
Facility power16 MW (range 6.5 MW to 41 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 136,261 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 6,800 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressChelsea Boulevard 2300, 75013, Allen
Coordinates33.13945, -96.66014
Websitecyrusone.com/data-centers/north-america/allen-texas

Satellite view

Questions

How much power does CyrusOne Allen Campus use?

We estimate the facility power at about 16 MW. Estimate from building footprint, low confidence.

Who operates CyrusOne Allen Campus?

CyrusOne.

Data centers near Allen

More CyrusOne data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.