Amazon IAD-150
Amazon IAD-150 is an operational data center operated by Amazon Web Services in Chantilly, United States. Our footprint estimate of its power is about 63 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Amazon Web Services |
| Facility power | 63 MW (range 31 MW to 101 MW) Estimate from building footprint, low confidence. Footprint estimate: about 52,444 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | AWS Trainium and NVIDIA GPUs Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs. |
| GPU capacity if all AI | about 27,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Amazon IAD-152 · Amazon IAD-151 |
| Address | Sutton Bay Plaza 25430, 20152, Chantilly |
| Coordinates | 38.91607, -77.47725 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Amazon IAD-150 use?
We estimate the facility power at about 63 MW. Estimate from building footprint, low confidence.
What chips does Amazon IAD-150 use?
No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.
Who operates Amazon IAD-150?
Amazon Web Services.
Data centers near Chantilly
- Data center in South Riding 755 m · 13 MW
- H5 Data Centers Virginia (4030) 775 m · 20 MW
- ATI Solutions 899 m · 3 MW
- Amazon IAD-156 941 m · 14 MW
- Amazon IAD-61 1.3 km · 32 MW
- 4120 Lafayette Center Drive 1.3 km · 4.7 MW
- Amazon IAD-86 1.6 km · 16 MW
- Amazon IAD-135 2.3 km · 21 MW
More Amazon Web Services data centers
- Anthropic-Amazon New Carlisle United States
- Amazon Ridgeland United States
- Amazon Madison Mega Site United States
- AWS New Albany United States
- AWS Canton Data Center United States
- AWS Berwick United States
- AWS Ridgeland Data Center United States
- AWS Umatilla Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.