QTS Richmond 1 is an operational AI data center operated by Quality Technology Services in Sandston, United States. Its power is about 333 MW. Epoch AI estimates about 243,000 H100-equivalent AI chips.
Key facts
| Status | Operational |
|---|---|
| Operator | Quality Technology Services |
| Facility power | 333 MW Reported (Epoch AI or owner data) |
| IT power | 238 MW |
| AI compute | 243,000 H100-equivalents |
| GPU capacity if all AI | about 130,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 9.0 billion Epoch AI estimate, 2025 USD. |
| Energy partners | Dominion Energy |
| Also known as | QTS Richmond 1 Data Center · RIC1 DC1 · RIC1 DC2 |
| Address | 6000 Technology Blvd, Sandston, VA 23150 |
| Coordinates | 37.48883, -77.24749 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2023-09-01 | 0 | 0 | Land clearing begins for site expansion, some materials down at substation site. We assume that Buildings 1 and 2 are not running AI workloads at this point due to the lack of cooling infrastructure. |
| 2023-11-02 | 0 | 0 | Building 1 and 2 retrofitting has begun (see [Google Earth](https://earth.google.com/web/@37.48913637,-77.24705465,44.31788662a,1464.06665017d,30.00094375y,3.66969189h,0t,0r/data=ChYqEAgBEgoyMDIzLTExLTAyGAFCAggBMikKJwolCiExWVNYSWZQZkcydXVMYm1nUDkyc2NObE1QenF1VGRVV2cgAToDCgEwQgIIAEoICMOJgf0CEAE)). Building 1 has chillers added to the roof and perimeter, and backup generators added to the perimeter. |
| 2024-01-29 | 66 MW | 34,000 | Building 1 (retrofitted) is operational. This is based on it looking complete, and cooling towers possibly showing water vapor plumes, in this [Google Earth image](https://earth.google.com/web/@37.4875167,-77.24806799,43.67572425a,2395.6622579d,30.00094375y,3.66969189h,0t,0r/data=ChYqEAgBEgoyMDI0LTAyLTA2GAFCAggBMikKJwolCiExWVNYSWZQZkcydXVMYm1nUDkyc2NObE1QenF1VGRVV2cgAToDCgEwQgIIAEoICMOJgf0CEAE). Building 2 has chillers added to the roof and perimeter, and backup generators added to the perimeter. Cooling towers near Building 2 have been removed. Building 3 shell is under construction. |
| 2024-06-23 | 132 MW | 68,000 | Building 2 (retrofitted) is operational. This is based on Building 2 looking compelte, and construction around Building 1 and 2 being mostly cleared. A colored motion artifact on one of the Building 1 cooling tower fans suggests it is moving. Building 3 cooling is installed, backup generators partly installed. Building 4 shell is under construction. |
| 2025-02-04 | 199 MW | 126,000 | Building 3 is operational, based on the building looking complete and the carpark to the south being full. Three more backup generators added to the Building 1 and 2 area, with a lot more construction equipment again (but this could be a laydown area for Richmond 2). Building 4 has cooling and backup generators fully installed. Building 5 has cooling installed, and backup generators partly installed. |
| 2025-06-03 | 266 MW | 184,000 | Building 4 is operational, based on a complete building and full carpark in a [Google Earth image](https://earth.google.com/web/@37.48350155,-77.25010039,60.24751599a,83.68032361d,30.00094375y,3.66969189h,0t,0r/data=CgwqBggBEgAYAUICCAEyKQonCiUKITFZU1hJZlBmRzJ1dUxibWdQOTJzY05sTVB6cXVUZFVXZyABOgMKATBCAggASggIw4mB_QIQAQ). Building 5 does not seem quite operational given the empty carpark and construction activity at the perimeter. |
| 2025-11-19 | 333 MW | 243,000 | Building 5 is operational, based on a complete building and full carpark in a [Google Earth image](https://earth.google.com/web/@37.48747566,-77.2485616,47.03705985a,2549.72172121d,30.00094375y,3.66969189h,0t,0r/data=ChYqEAgBEgoyMDI1LTExLTE5GAFCAggBMikKJwolCiExWVNYSWZQZkcydXVMYm1nUDkyc2NObE1QenF1VGRVV2cgAToDCgEwQgIIAEoICMOJgf0CEAE). Construction equipment around Building 1 and 2 has cleared up again. |
| 2025-12-31 | 333 MW | 243,000 | No changes to the site since November 2025. |
| 2026-02-13 | 333 MW | 243,000 | No changes to the site since December 2025. |
Source: Epoch AI Frontier Data Centers.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does QTS Richmond 1 use?
Public data puts the facility power at about 333 MW. Reported (Epoch AI or owner data).
Who operates QTS Richmond 1?
Quality Technology Services.
Data centers near Sandston
- RIC1 DC3 259 m
- DC5 472 m · 57 MW
- QTS Richmond 2 Data Center 581 m · 86 MW
- RIC2 DC2 606 m · 50 MW
- Meta Research SuperCluster (RSC-1) 1.0 km · 13 MW
- QTS Richmond 3 Data Center 1.1 km · 76 MW
- Bank of America Data Center 1.1 km · 38 MW
- RIC3 DC5 1.3 km · 54 MW
More Quality Technology Services data centers
- QTS Piscataway Data Center United States
- QTS Richmond 2 Data Center United States
- QTS Richmond 3 Data Center United States
- Quality Technology Services data center in Sterling United States
- QTS Atlanta Data Center 1 United States
- DC5 United States
- QTS United States
- QTS Ashburn-Shellhorn United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.