Data Center Directory

Amazon IAD-89

Amazon IAD-89 is an operational data center operated by Amazon Web Services in Sterling, United States. Our footprint estimate of its power is about 37 MW. Likely chips: AWS Trainium and NVIDIA GPUs (guess).

Key facts

StatusOperational
OperatorAmazon Web Services
Facility power37 MW (range 19 MW to 59 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 30,915 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsAWS Trainium and NVIDIA GPUs
Guess from the operator, not confirmed. AWS deploys its own Trainium chips next to NVIDIA GPUs.
GPU capacity if all AIabout 16,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asAmazon IAD-88
AddressLoudoun Downs Lane 45111, 20166, Sterling
Coordinates38.99097, -77.44187

Satellite view

Questions

How much power does Amazon IAD-89 use?

We estimate the facility power at about 37 MW. Estimate from building footprint, low confidence.

What chips does Amazon IAD-89 use?

No chips are reported. Based on the operator, the likely chips are AWS Trainium and NVIDIA GPUs.

Who operates Amazon IAD-89?

Amazon Web Services.

Data centers near Sterling

More Amazon Web Services data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.