Microsoft Fairwater AI Datacenter
Microsoft Fairwater AI Datacenter is an operational data center in Sturtevant, United States. Our footprint estimate of its power is about 123 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 123 MW (range 49 MW to 308 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,025,740 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 53,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | April 2026 |
| Coordinates | 42.67630, -87.90010 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Fairwater AI Datacenter use?
We estimate the facility power at about 123 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Fairwater AI Datacenter use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
Data centers near Sturtevant
- Data center in Sturtevant 425 m · 27 MW
- Microsoft Fairwater Wisconsin 455 m · 442 MW
- Microsoft Fairwater AI Phase 2 838 m · 105 MW
- Data center in Sturtevant 1.5 km · 1 MW
- Microsoft Fairwater Phase 2 3.2 km · 316 MW
- CyberLynk MKE1 21.7 km
- Expedient Milwaukee 21.7 km · 2.7 MW
- TierPoint Milwaukee 37.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.