Dell 350 Holger Way
Dell 350 Holger Way is an operational data center in San Jose, United States. Our footprint estimate of its power is about 4.6 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.6 MW (range 2.3 MW to 7.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,806 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Holger Way 400, 95134, San Jose |
| Coordinates | 37.41838, -121.94312 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Dell 350 Holger Way use?
We estimate the facility power at about 4.6 MW. Estimate from building footprint, low confidence.
Data centers near San Jose
- ServerFarm SC1 2.4 km · 5.1 MW
- Coresite - Milpitas (SV2) 2.8 km · 14 MW
- Evocative SJC11 3.6 km · 7.5 MW
- Amazon 3.8 km · 9.8 MW
- Centersquare Silicon Valley (SFO2) 4.0 km · 11 MW
- Csquare SFO2 4.1 km · 15 MW
- QTS Santa Clara (SJC1/SJC2) 4.1 km · 3.8 MW
- EdgeCore Silicon Valley 4.2 km · 14 MW