Data Center Directory

Project Mountain

Project Mountain is an operational data center operated by Microsoft in West Des Moines, United States. Our footprint estimate of its power is about 17 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
Facility power17 MW (range 6.6 MW to 41 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 137,872 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMicrosoft
AddressGrand Avenue 8855, 50266, West Des Moines
Coordinates41.54020, -93.82685

Satellite view

Questions

How much power does Project Mountain use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

What chips does Project Mountain use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

Who operates Project Mountain?

Microsoft.

Data centers near West Des Moines

More Microsoft data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.