White Oak Technology Park 2
White Oak Technology Park 2 is an operational data center operated by QTS in Sandston, United States. Our footprint estimate of its power is about 15 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | QTS |
| Facility power | 15 MW (range 6.2 MW to 39 MW) Estimate from building footprint, low confidence. Footprint estimate: about 128,794 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 37.50619, -77.25496 |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does White Oak Technology Park 2 use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
Who operates White Oak Technology Park 2?
QTS.
Data centers near Sandston
- QTS Richmond - (RIC5) 679 m
- Bank of America Data Center 1.9 km · 38 MW
- Iron Mountain data center in Sandston 2.0 km · 41 MW
- QTS Richmond 1 2.0 km · 333 MW
- RIC1 DC3 2.2 km
- QTS Richmond (RIC1) 2.2 km
- DC5 2.4 km · 57 MW
- RIC2 DC2 2.5 km · 50 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.