CoreWeave Dalton 1 & 2

CoreWeave Dalton 1 & 2 is an operational AI data center operated by CoreWeave in GA, United States. Its power is about 40 MW. Epoch AI estimates about 32,000 H100-equivalent AI chips (B300).

Key facts

StatusOperational
OperatorCoreWeave
UsersOpenAI (speculative)
Facility power40 MW
Reported (Epoch AI or owner data)
IT power28 MW
AI compute32,000 H100-equivalents
AI chipsB300
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 16,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 1.1 billion
Epoch AI estimate, 2025 USD.
Address2205 Industrial South Rd, Dalton, GA, 30721
Coordinates34.71344, -84.95215

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-06-0300According to a [few](https://investors.corescientific.com/news-events/press-releases/detail/74/core-scientific-to-provide-approximately-200-mw-of-infrastructure-to-host-coreweaves-high-performance-computing-services-capturing-significant-ai-compute-opportunity) [sources](https://www.sec.gov/Archives/edgar/data/1839341/000162828025008302/core-20241231.htm), Core Scientific announced that they're rebuilding their existing Dalton 1 (and we're assuming 2) datacenter to run AI using CoreWeave's GPUs, of which contract was first signed on this date. According to the press release, "The site modifications are expected to commence early in the second half of 2024 and achieve operational status in the first half of 2025."
2025-05-0100Core Scientific investor presentation clearly shows Dalton 1 with a cleared pad on this month for construction. Source: https://investors.corescientific.com/sec-filings/all-sec-filings/content/0001140361-25-039864/0001140361-25-039864.pdf
2025-08-2900Based on Satellite imagery, Dalton 1 is still under construction. The building appears mostly roofed except for the entrance area, and there are no cooling units or backup generators installed yet.
2026-02-2040 MW32,000Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery. All cooling/mechanical rows are installed, with no obvious active building construction visible.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2026-02-20B30012,750Estimate

Satellite view

Questions

How much power does CoreWeave Dalton 1 & 2 use?

Public data puts the facility power at about 40 MW. Reported (Epoch AI or owner data).

What chips does CoreWeave Dalton 1 & 2 use?

Reported chips: B300.

Who operates CoreWeave Dalton 1 & 2?

CoreWeave. Reported users: OpenAI.