CoreWeave Norway
CoreWeave Norway is an operational AI data center operated by CoreWeave in Vennesla, Norway. Its power is about 55 MW. Epoch AI estimates about 51,000 H100-equivalent AI chips (B200).
Key facts
| Status | Operational |
|---|---|
| Operator | CoreWeave |
| Users | OpenAI (speculative) |
| Facility power | 55 MW Reported (Epoch AI or owner data) |
| IT power | 42 MW |
| AI compute | 51,000 H100-equivalents |
| AI chips | B200 Reported (Epoch AI or owner data) |
| Chip count | 2,048 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 23,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 1.6 billion Epoch AI estimate, 2025 USD. |
| Also known as | Bulk N01 Campus |
| Address | Stølevegen 39, 4715 Øvrebø, Norway |
| Coordinates | 58.25757, 7.89205 |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-01-23 | 0 | 0 | [This article](https://bulkinfrastructure.com/newsroom/bulk-data-centers-unveils-plan-for-data-center-expansion-following-unprecedented-demand) from Bulk Infrastructure says construction had started on the "next 42 MW facility" by this date, so we model it as starting from here. |
| 2025-07-27 | 55 MW | 51,000 | Building 1 appears to be operational based on satellite imagery, so we model it as operational from this date. In addition, [Bulk](https://bulkinfrastructure.com/newsroom/coreweave-partners-with-bulk-infrastructure) said CoreWeave’s Norway AI deployment was expected to be operational by summer 2025. Since this lines up nicely with the new 42 MW building, we assume the 42 MW of Building 1 is fully leased by CoreWeave. |
| 2026-04-25 | 55 MW | 51,000 | Building 1 perimeter is now fully paved. No other significant changes to Building 1 since the July 2025 image. |
| 2026-08-15 | 55 MW | 51,000 | Building 1 still operational. No new major developments since the April image, though the large land clearing to the southwest is now much more clearly visible. [Bulk](https://bulkinfrastructure.com/newsroom/bulk-infrastructure-secures-410-million-for-n01-data-center-campus-expansion) is saying this expansion could include AI datacenters, but we don't have any confirmation this expansion is for CoreWeave yet. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2025-07-27 | B200 | 20,096 | Estimate |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Northern Data Group Taiga Cloud NO1 Island 2 | NVIDIA H100 SXM5 80GB | 2,048 | 2.9 MW | 2024-03-30 |
| Northern Data Group Taiga Cloud NO1 Island 1 | NVIDIA H100 SXM5 80GB | 2,048 | 2.9 MW | 2024-03-30 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CoreWeave Norway use?
Public data puts the facility power at about 55 MW. Reported (Epoch AI or owner data).
What chips does CoreWeave Norway use?
Reported chips: B200.
Who operates CoreWeave Norway?
CoreWeave. Reported users: OpenAI.
Data centers near Vennesla
More CoreWeave data centers
- Coreweave Helios United States
- CoreWeave Ellendale ND United States
- CoreWeave Denton TX United States
- CoreWeave Chester VA United States
- CoreWeave Muskogee OK United States
- CoreWeave Lancaster Greenfield site United States
- CoreWeave Marble NC United States
- CoreWeave Dalton 1 & 2 United States
Sources
Correct this page or get the data