CoreWeave Norway is an operational AI data center operated by CoreWeave in Vennesla, Norway. Its power is about 55 MW. Epoch AI estimates about 51,000 H100-equivalent AI chips (B200).

Key facts

StatusOperational
OperatorCoreWeave
UsersOpenAI (speculative)
Facility power55 MW
Reported (Epoch AI or owner data)
IT power42 MW
AI compute51,000 H100-equivalents
AI chipsB200
Reported (Epoch AI or owner data)
Chip count2,048
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 23,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 1.6 billion
Epoch AI estimate, 2025 USD.
Also known asBulk N01 Campus
AddressStølevegen 39, 4715 Øvrebø, Norway
Coordinates58.25757, 7.89205

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-01-2300[This article](https://bulkinfrastructure.com/newsroom/bulk-data-centers-unveils-plan-for-data-center-expansion-following-unprecedented-demand) from Bulk Infrastructure says construction had started on the "next 42 MW facility" by this date, so we model it as starting from here.
2025-07-2755 MW51,000Building 1 appears to be operational based on satellite imagery, so we model it as operational from this date. In addition, [Bulk](https://bulkinfrastructure.com/newsroom/coreweave-partners-with-bulk-infrastructure) said CoreWeave’s Norway AI deployment was expected to be operational by summer 2025. Since this lines up nicely with the new 42 MW building, we assume the 42 MW of Building 1 is fully leased by CoreWeave.
2026-04-2555 MW51,000Building 1 perimeter is now fully paved. No other significant changes to Building 1 since the July 2025 image.
2026-08-1555 MW51,000Building 1 still operational. No new major developments since the April image, though the large land clearing to the southwest is now much more clearly visible. [Bulk](https://bulkinfrastructure.com/newsroom/bulk-infrastructure-secures-410-million-for-n01-data-center-campus-expansion) is saying this expansion could include AI datacenters, but we don't have any confirmation this expansion is for CoreWeave yet.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2025-07-27B20020,096Estimate

GPU clusters at this site

ClusterChipsCountPowerSince
Northern Data Group Taiga Cloud NO1 Island 2NVIDIA H100 SXM5 80GB2,0482.9 MW2024-03-30
Northern Data Group Taiga Cloud NO1 Island 1NVIDIA H100 SXM5 80GB2,0482.9 MW2024-03-30

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does CoreWeave Norway use?

Public data puts the facility power at about 55 MW. Reported (Epoch AI or owner data).

What chips does CoreWeave Norway use?

Reported chips: B200.

Who operates CoreWeave Norway?

CoreWeave. Reported users: OpenAI.