Meta Clonee 6 Data Center

Meta Clonee 6 Data Center is an operational data center operated by Meta in Dunboyne, Ireland. Our footprint estimate of its power is about 89 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Key facts

StatusOperational
OperatorMeta
Facility power89 MW (range 44 MW to 142 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 73,905 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 38,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asMeta Clonee 5 Data Center
Coordinates53.41952, -6.44749

Satellite view

Questions

How much power does Meta Clonee 6 Data Center use?

We estimate the facility power at about 89 MW. Estimate from building footprint, low confidence.

What chips does Meta Clonee 6 Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

Who operates Meta Clonee 6 Data Center?

Meta.