Data Center Directory

Meta Clonee Data Center

Meta Clonee Data Center is an operational data center in Dunboyne, Ireland. Our footprint estimate of its power is about 262 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Key facts

StatusOperational
Facility power262 MW (range 105 MW to 654 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,180,181 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 110,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates53.41771, -6.43793

Satellite view

Questions

How much power does Meta Clonee Data Center use?

We estimate the facility power at about 262 MW. Estimate from building footprint, low confidence.

What chips does Meta Clonee Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

Data centers near Dunboyne

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.