Data Center Directory

TierPoint Dallas2 - Allen

TierPoint Dallas2 - Allen is an operational data center operated by TierPoint in Allen, United States. Our footprint estimate of its power is about 2.6 MW.

Key facts

StatusOperational
OperatorTierPoint
Facility power2.6 MW (range 1 MW to 6.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 21,665 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks6 networks, 1 internet exchanges
PeeringDB.
Also known asCyrusOne Dallas (Allen)
Address820 Allen Commerce Parkway
Coordinates33.13752, -96.65791
Websitetierpoint.com/data-centers/texas/dallas-allen

Satellite view

Questions

How much power does TierPoint Dallas2 - Allen use?

We estimate the facility power at about 2.6 MW. Estimate from building footprint, low confidence.

Who operates TierPoint Dallas2 - Allen?

TierPoint.

Data centers near Allen

More TierPoint data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.