Data Center Directory

TierPoint Nashville

TierPoint Nashville is an operational data center operated by TierPoint in Franklin, United States. Our footprint estimate of its power is about 3.4 MW.

Key facts

StatusOperational
OperatorTierPoint
Facility power3.4 MW (range 1.3 MW to 8.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 28,118 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 1,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks4 networks
PeeringDB.
Also known asTierPoint
Address311 Eddy Lane
Coordinates35.92457, -86.85582
Websitetierpoint.com/data-centers/tennessee/nashville

Satellite view

Questions

How much power does TierPoint Nashville use?

We estimate the facility power at about 3.4 MW. Estimate from building footprint, low confidence.

Who operates TierPoint Nashville?

TierPoint.

Data centers near Franklin

More TierPoint data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.