TierPoint Baltimore
TierPoint Baltimore is an operational data center operated by TierPoint in Baltimore, United States. Our footprint estimate of its power is about 4.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | TierPoint |
| Facility power | 4.1 MW (range 2 MW to 6.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,410 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 7 networks PeeringDB. |
| Also known as | Baltimore Technology Park |
| Address | 1401 Russell Street |
| Coordinates | 39.27541, -76.62546 |
| Website | tierpoint.com/data-centers/maryland/baltimore |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TierPoint Baltimore use?
We estimate the facility power at about 4.1 MW. Estimate from building footprint, low confidence.
Who operates TierPoint Baltimore?
TierPoint.
Data centers near Baltimore
- Lumen Baltimore 1.9 km
- Zayo Baltimore - 111 Market Pl 2.1 km
- Expedient Tidepoint 2.9 km
- Johns Hopkins Data Center 6.7 km · 0.6 MW
- TierPoint Baltimore – BWI 8.3 km
- TierPoint Baltimore BWI 8.5 km · 7.4 MW
- Cogent Elkridge 11.0 km · 6.3 MW
- AiNET MD-790R 15.3 km · 11 MW
More TierPoint data centers
- TierPoint St. Louis - Olive United States
- TierPoint Boston - Andover United States
- TierPoint Kansas City - Lenexa United States
- TierPoint Sioux Falls - West United States
- TIerPoint Little Rock United States
- TierPoint Nashville United States
- TierPoint Tulsa-Archer United States
- TierPoint Dallas2 - Allen United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.