TierPoint St. Louis - Olive
TierPoint St. Louis - Olive is an operational data center operated by TierPoint in St. Louis, United States. Our footprint estimate of its power is about 13 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | TierPoint |
| Facility power | 13 MW (range 6.6 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,765 m² building outline x 4 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 5,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks PeeringDB. |
| Also known as | TierPoint |
| Address | 1111 Olive Street |
| Coordinates | 38.62976, -90.19640 |
| Website | tierpoint.com |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does TierPoint St. Louis - Olive use?
We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.
Who operates TierPoint St. Louis - Olive?
TierPoint.
Data centers near St. Louis
- Netrality St. Louis - 210 N Tucker 92 m · 19 MW
- 710 Tucker St Louis 334 m
- Netrality St. Louis - 900 Walnut 480 m
- TierPoint St. Louis - Locust 1.5 km
- Cogent St Louis 1.7 km
- Genome Data Center 5.2 km · 3.7 MW
- TierPoint St. Louis – Millpark 20.2 km
- Data center in Edwardsville 29.4 km
More TierPoint data centers
- TierPoint Boston - Andover United States
- TierPoint Kansas City - Lenexa United States
- TierPoint Sioux Falls - West United States
- TIerPoint Little Rock United States
- TierPoint Baltimore United States
- TierPoint Nashville United States
- TierPoint Tulsa-Archer United States
- TierPoint Dallas2 - Allen United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.